![]() NOTE: The larger the PVC pipe, the deeper the trench, with more cover. Trenching Soil: Not less than 18 inches (18”) deep, with a minimum of 15-inch (15”) cover.Trenching Rock: Not less than 12 inches (12”) deep, with a minimum of 9-inch (9”) cover.Bury PVC Pipe not less than 6 inches (6”) from telephone pole/pedestal.Stub not less than 3 feet (3’) above the grade at subscriber’s location, where the telephone inside wire enters the house.Distance 300 feet or more, contact GVTC for requirements.Distance between 200 feet and 300 feet require two-inch (2”) PVC Pipe.Distance between 100 feet and 200 feet require one and one quarter-inch (1-1/4”) PVC Pipe.Distance 100 feet or less require one-inch (1”) PVC Pipe.Electrician Sweeps for turns (90-degree tees are not permitted).SPECIFICATION REQUIREMENTS: PVC REQUIREMENTS ![]() Subscriber is strongly advised to verify subdivision deed requirements, as trench and PVC may be furnished by another entity. It is the subscriber’s responsibility to provide a trench with PVC and pull string from the service pole and/or pedestal to the subscriber’s residence, per the specifications listed below: It is the subscriber’s responsibility to provide a trench with PVC and pull string from the service pole and/or pedestal to the subscriber’s residence or business.Īvoid possible service interruptions, injury and costly liability. Before Construction Starts, Call For a Free Facilities Locate.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |